Our Work

Projects Across Rajasthan

200+ rooftop installations and 50,000+ solar pumps. A selection of residential, commercial, and agricultural projects from across the state.

0+
Solar Pumps
0+
Rooftop Systems
0MW+
Capacity Installed
0+
Districts Covered
3kW On-Grid · Vaishali Nagar, Jaipur
Residential

3kW On-Grid · Vaishali Nagar, Jaipur

Jaipur

PM Surya Ghar subsidy of Rs. 78,000 credited in 55 days. Bill reduced from Rs. 4,800 to Rs. 420/month.

Rs. 78K subsidy
50kW On-Grid · Sitapura Industrial Area
Commercial

50kW On-Grid · Sitapura Industrial Area

Jaipur

Manufacturing unit. 75% of daytime load covered. Monthly saving Rs. 63,000. ROI in under 4 years.

Rs. 63K/mo saved
7.5HP DC Pump · Nagaur District
Solar Pump

7.5HP DC Pump · Nagaur District

Nagaur

20 bigha cotton farm. Diesel engine permanently replaced. Zero running cost irrigation year-round.

Diesel eliminated
5kW On-Grid · Malviya Nagar, Jaipur
Residential

5kW On-Grid · Malviya Nagar, Jaipur

Jaipur

IB Solar panels on flat RCC roof. Net metering in 3 weeks. Monthly saving Rs. 5,250.

Rs. 5,250/mo saved
5HP Submersible · Dausa District
Solar Pump

5HP Submersible · Dausa District

Dausa

Borewell at 80m depth. Drip irrigation for 15 bigha. Mobile controlled. No grid required.

180K litres/day
10kW Hybrid · Ajmer Road, Jaipur
Hybrid

10kW Hybrid · Ajmer Road, Jaipur

Jaipur

Guest house with critical backup requirement. Solar plus battery delivers 8-hour backup.

8-hr backup
25kW On-Grid · Bagru Industrial Area
Commercial

25kW On-Grid · Bagru Industrial Area

Bagru

2-shift factory. Installed in 4 days. Zero production disruption. ROI in 4.5 years.

Rs. 38K/mo saved
3HP Surface · Bikaner District
Solar Pump

3HP Surface · Bikaner District

Bikaner

Canal-fed land. Surface pump for drip irrigation. No grid needed. Zero annual maintenance cost.

90K litres/day
8kW On-Grid · C-Scheme, Jaipur
Residential

8kW On-Grid · C-Scheme, Jaipur

Jaipur

Large home. PM Surya Ghar plus state incentive. 92% electricity bill reduction from month one.

92% bill cut
Case Study

Sitapura Manufacturing Unit: 50kW Rooftop

A detailed look at a commercial installation that reduced monthly electricity costs by over 70%.

50kW commercial rooftop solar
Commercial · 50kW
50kW
System Size
4 Days
Installation
Rs. 63K
Monthly Savings
< 4 Years
Payback Period

The Challenge

A manufacturing unit in Sitapura Industrial Area had monthly electricity bills exceeding Rs. 85,000. Running two shifts meant peak daytime consumption — which is precisely when solar generates at full capacity.

Our Solution

We designed a 50kW on-grid rooftop system using IB Solar modules, optimised for the flat industrial roof layout. Installation was completed in 4 working days with zero disruption to factory operations.

The Result

Monthly electricity cost fell from Rs. 85,000 to under Rs. 22,000. The system generates 6,750 units per month, covering 75% of daytime load. Full return on investment expected in under 4 years.

Discuss a Similar Project

Have a Project in Mind?

Our team will visit, assess, and give you a detailed proposal within 48 hours.

Contact Us